✨ New Arrivals Just Dropped!Explore
Product image 1
Product image 2
Product image 3
Product image 4
Product image 5
Product image 6
HomeStore

S4102-04 LB&SCR K Class 2-6-0 Southern Maunsell Dark Olive Green No.2346 Steam Locomotive

S4102-04 LB&SCR K Class 2-6-0 Southern Maunsell Dark Olive Green No.2346 Steam Locomotive

Expected Delivery Q1 / Q2 2026 (Subject to Change at Manufacturer's Discretion).

Available Exclusively from Rails of Sheffield

LB&SCR K Class 2-6-0 Southern 2346 Maunsell Dark Olive Green, Dark Olive Green Wheels with Black Tyres, Black and White Lining Steam Locomotive

History

The LBSCR Engineer Lawson Billinton in 1912 designed a new powerful goods locomotive that coped with heavy loads at speed. No 337 appeared the following year (1913) and by 1921 a total of 17 had been constructed at Brighton works. They proved to be very successful providing invaluable support during WW1 when very large freight movements were required.

The locomotives also coped well with passenger services providing a good all-round service to the railway. Billinton was not afraid to improve the steaming characteristics to help reduce coal running costs and the design innovations included an additional dome and top feed. This feature was improved and the last seven locomotives left Brighton works including this feature which lasted through to the end of the 1920’s before all were modified back to one dome.

More would have been built but for the fact that the LBSCR was merged into the larger SR in 1923 and the new company appointed a new Engineer Richard. E. L. Maunsell. He favoured his own N and U class designs so no more K Class locomotives were built.

In the 1930’s Maunsell improved the cab design and lowered the height as well as the dome and chimney to operate to the composite loading gauge.

Under BR ownership only minor changes were made. Removal of the LHS Weir Water Heaters in the early 1950’s and later modifications to the tender to include water treatment. Interestingly at the end of all their working lives the N and U designs cost far more to maintain with serious design faults in the frames and cylinders.

The K Class design proved reliable right to the end. One locomotive No 32353 was offered to the Bluebell Railway for preservation but unfortunately the society was struggling in 1962/3 to raise money to buy the track and infrastructure and could not afford the extra expense. (It is surprising the locomotive was not offered to the National Collection)

Specification

  • The tooling covers detail prototypical original and later body and tender details: Chimneys, domes, cabs, safety valves, Westinghouse pump, Water heater,
  • AWS equipment and lamp/disc detail bracket variations. 
  • Heavy Die cast firebox, boiler and smokebox to aid traction.
  • Models overall assembled weight, 330 grammes.
  • Smooth 12V powerful motor with flywheel
  • Easy access to 21 pin DCC decoder socket mounted in the tender.
  • Factory fitted DCC sound sugar cube speaker inside the tender.
  • Loco/tender linkage fully adjustable to suit users track radii.
  • Electrical pick-up via all six driving and tender wheels.
  • Full cab detail.
  • Illuminated firebox.
  • Detailed inner linkage under boiler and frames.
  • NEM couplings and hand assembled detailing parts three link couplings.
  • Fireman shovel and firebox tools.
  • Packed in a strong outer box and mounted on a secure moulded transit plate to minimise damage in transit.


$254.76
S4102-04 LB&SCR K Class 2-6-0 Southern Maunsell Dark Olive Green No.2346 Steam Locomotive
$254.76

Product Information

Shipping & Returns

Description

Expected Delivery Q1 / Q2 2026 (Subject to Change at Manufacturer's Discretion).

Available Exclusively from Rails of Sheffield

LB&SCR K Class 2-6-0 Southern 2346 Maunsell Dark Olive Green, Dark Olive Green Wheels with Black Tyres, Black and White Lining Steam Locomotive

History

The LBSCR Engineer Lawson Billinton in 1912 designed a new powerful goods locomotive that coped with heavy loads at speed. No 337 appeared the following year (1913) and by 1921 a total of 17 had been constructed at Brighton works. They proved to be very successful providing invaluable support during WW1 when very large freight movements were required.

The locomotives also coped well with passenger services providing a good all-round service to the railway. Billinton was not afraid to improve the steaming characteristics to help reduce coal running costs and the design innovations included an additional dome and top feed. This feature was improved and the last seven locomotives left Brighton works including this feature which lasted through to the end of the 1920’s before all were modified back to one dome.

More would have been built but for the fact that the LBSCR was merged into the larger SR in 1923 and the new company appointed a new Engineer Richard. E. L. Maunsell. He favoured his own N and U class designs so no more K Class locomotives were built.

In the 1930’s Maunsell improved the cab design and lowered the height as well as the dome and chimney to operate to the composite loading gauge.

Under BR ownership only minor changes were made. Removal of the LHS Weir Water Heaters in the early 1950’s and later modifications to the tender to include water treatment. Interestingly at the end of all their working lives the N and U designs cost far more to maintain with serious design faults in the frames and cylinders.

The K Class design proved reliable right to the end. One locomotive No 32353 was offered to the Bluebell Railway for preservation but unfortunately the society was struggling in 1962/3 to raise money to buy the track and infrastructure and could not afford the extra expense. (It is surprising the locomotive was not offered to the National Collection)

Specification

  • The tooling covers detail prototypical original and later body and tender details: Chimneys, domes, cabs, safety valves, Westinghouse pump, Water heater,
  • AWS equipment and lamp/disc detail bracket variations. 
  • Heavy Die cast firebox, boiler and smokebox to aid traction.
  • Models overall assembled weight, 330 grammes.
  • Smooth 12V powerful motor with flywheel
  • Easy access to 21 pin DCC decoder socket mounted in the tender.
  • Factory fitted DCC sound sugar cube speaker inside the tender.
  • Loco/tender linkage fully adjustable to suit users track radii.
  • Electrical pick-up via all six driving and tender wheels.
  • Full cab detail.
  • Illuminated firebox.
  • Detailed inner linkage under boiler and frames.
  • NEM couplings and hand assembled detailing parts three link couplings.
  • Fireman shovel and firebox tools.
  • Packed in a strong outer box and mounted on a secure moulded transit plate to minimise damage in transit.


You may also like

-65%NEW
Thumbnail 1Thumbnail 2

372-400A LNER J39 with Stepped Tender 4761 LNER Black (LNER Original)

$170.93

$59.83

-65%NEW
Thumbnail 1

372-754 LMS Fairburn Tank 2278 LMS Black (Revised) - Weathered

$193.74

$67.81

-65%NEW
Thumbnail 1Thumbnail 2

373-219 24T Iron Ore Hopper 'B.I.S.C. Iron Ore' Red 776

$26.76

$9.37

NEW
Thumbnail 1Thumbnail 2

OR76SCS1002 Standard Cowans Sheldon 15T Crane LMS Wellingborough 243

$113.93

-65%NEW
Thumbnail 1Thumbnail 2

OR76J26001 Class J26 LNER 0-6-0 Steam Locomotive No.1057

$148.13

$51.85

NEW
Thumbnail 1Thumbnail 2

OR76SCS2002 Standard Cowans Sheldon 15T Crane LNER Sunderland 901628

$113.93

-65%NEW
Thumbnail 1

PA64 Parkside Dundas PA64 SR 8 Wagons Tarps

$18.17

$6.36

-65%NEW
Thumbnail 1

PA61 Parkside Dundas PA61 GWR 8 Wagons Tarps

$18.17

$6.36

-65%NEW
Thumbnail 1

PA63 Parkside Dundas PA63 LNER 8 Wagons Tarps

$18.17

$6.36

-65%NEW
Thumbnail 1

PS94 Parkside Dundas PS94 SR 3 Wagons Tarps

$17.64

$6.17

-65%NEW
Thumbnail 1

PS93 Parkside Dundas PS93 LNER 3 Wagons Tarps

$17.64

$6.17

-65%NEW
Thumbnail 1

PS91 Parkside Dundas PS91 GWR 3 Wagons Tarps

$17.64

$6.17

S4102-04 LB&SCR K Class 2-6-0 Southern Maunsell Dark Olive Green No.2346 Steam Locomotive | Rails of Sheffield